•     Project Management R504D56-3001 17.01.2022-15.04.2022  5 cr  (R54D21S) +-
    Learning objectives
    The student understands the principles of project management and can produce the documentation required by the project. The student is capable to apply project management practices in a small-scale IT project.
    Contents
    Basics of project management: process and documentation

    - Integration Management
    - Scope Management
    - Schedule Management
    - Cost Management
    - Quality Management
    - Resource Management
    - Communication Management
    - Risk Management
    Assessment criteria
    Assessment criteria - grade 1
    The student outlines the phases of project process.

    The student can produce the documentation required by the project. The student can carry out the project, but the control of the implementation is random and incomplete and is not based on indicators.
    Assessment criteria - grade 3
    The student knows the phases of project process.

    The student can produce the documentation required by the project.

    The student can take the project through and guide the project based on indicators.
    Assessment criteria - grade 5
    The student has an in-depth knowledge of the phases of project process.

    The student can produce high-quality project documentation.

    The student can guide the project based on the information produced by the project indicators.

    Teaching methods and instruction

    Lectures and a learning project.

    Responsible person

    Juhani Angelva

    Learning material and recommended literature

    Kathryn N. Wells , Timothy J. Kloppenborg, Project Management Essentials, Second Edition

    Mode of delivery

    80% Contact teaching, 20% Distance learning

    Exam dates and re-exam possibilities

    No exam.

    Teaching language

    English

    Timing

    17.01.2022 - 15.04.2022

    Learning assignments

    5 x 27 h = 135 h

    Enrollment

    01.10.2021 - 25.12.2021

    Groups
    • R54D21S
    Assessment criteria

    Assessment criteria - grade 1 - 2 The student outlines the phases of project process. The student can produce the documentation required by the project. The student can carry out the project, but the control of the implementation is random and incomplete and is not based on indicators. Assessment criteria - grade 3 - 4 The student knows the phases of project process. The student can produce the documentation required by the project. The student can take the project through and guide the project based on indicators. Assessment criteria - grade 5 The student has an in-depth knowledge of the phases of project process. The student can produce high-quality project documentation. The student can guide the project based on the information produced by the project indicators.

    Teachers

    Juhani Angelva

    Degree Programmes

    Degree Programme in Information and Communication Technology

    R&D proportion

    1 cr

    Virtual proportion

    1 cr

    Evaluation scale

    H-5